800-245-0306
  • Home
  • Projects

Morrisville Resurface Project – Morrisville, NC

masthead-innerpage-overlay
masthead-innerpage-shape-large
title-logo-1

Morrisville Resurface Project – Morrisville, NC

Date: October 2022
Location: Morrisville, NC
Tonnage: 5580
Fiber: FORTA-FI®
FORTA-FI-in-Voyager-Drum-scaled-1
Voyager Aeriel.png
Paving-with-FORTA-FI-2-scaled-1
Paving-with-FORTA-FI-1-scaled-1
FORTA-FI-in-Voyager-Drum-scaled-1
Voyager Aeriel.png
Paving-with-FORTA-FI-2-scaled-1
Paving-with-FORTA-FI-1-scaled-1

Project Description

The City of Morrisville resurfaced its city streets with FORTA-FI reinforced asphalt. By choosing the 3” FRAC mill & fill instead of a 4” non-FRAC intermediate surface, this $1.1 million project saved $63,000. The decision to use FORTA-FI in this project came from the data of independent studies and will be a great example of Stronger Lasting™ pavement for years to come.

Technical Specifications

  • Fiber Reinforcement: FORTA-FI®
  • Additives: 30% RAP
  • Overlay Thickness: 3″
  • Delivery Method: Voyager
full-width
title-logo-1
experts on staff

Ready To Answer Questions & Aid In Technical Support

FORTA is a global leader in reinforcement fiber products, enhancing material performance and long-term durability in concrete, asphalt, and other applications by minimizing cracking and improving structural integrity.