800-245-0306

State Route 2020

masthead-innerpage-overlay
masthead-innerpage-shape-large
title-logo-1

State Route 2020

Date: 2013
Location: Philadelphia, PA
Tonnage: 43,000
Climate: Wet-Freeze
SR2020-1-1-scaled
SR2020-2-1-scaled
Tyburn-Road-SR-2020-Update-2023-1-rotated-1
Tyburn-Road-SR-2020-Update-2023-9-rotated-1
Tyburn-Road-SR-2020-Update-2023-6-1
SR2020-1-1-scaled
SR2020-2-1-scaled
Tyburn-Road-SR-2020-Update-2023-1-rotated-1
Tyburn-Road-SR-2020-Update-2023-9-rotated-1
Tyburn-Road-SR-2020-Update-2023-6-1

Project Description

This Tyburn Road project was full depth replacement of existing composite pavement which carries ADT of 18,799 with 5-27% truck traffic. The base course used consisted of PG 64-22, 25mm, 6” depth, HMA, 30 million ESAL SUPERPAVE mix, with PG76-22, 19mm, 3” depth HMA intermediate course, 30 million ESAL SUPERPAVE mix. The wearing course, placed in the summer of 2014, utilizes a PG76- 22, 2” Depth, 9.5mm, SRL E, 30+ ESAL SUPERPAVE mix. This section of road services a landfill and multimodal facility with considerable truck traffic.

Update

After 10 years, this high-volume roadway looks great with minimal cracking. Over the years very little crack seal was used throughout. The fiber side of the road held up noticeably better than the control side, especially in control sections consisting of large potholes.

Technical Specifications

  • Fiber Reinforcement: FORTA-FI®
  • Tonnage: 43,000
  • Thickness: 11″
  • Existing Distresses: High Volume Roadway
full-width
title-logo-1
experts on staff

Ready To Answer Questions & Aid In Technical Support

FORTA is a global leader in reinforcement fiber products, enhancing material performance and long-term durability in concrete, asphalt, and other applications by minimizing cracking and improving structural integrity.