FORTA-FERRO® was recently specified in 2013 by Desmone Associates & Architects in The Doughboy Apartment Complex and Retail Shops building project.  The building plan consisted of 42 apartments and 2 retail stores.  FORTA-FERRO® was used as an overlay for the precast beams that were used at the top of the parking garage to reduce cracking.  FORTA-FERRO® was pumped from a concrete truck.  The 3″ slab was finished with a steel trowel.  FORTA-FERRO® replaced 6×6-10 gauge steel reinforcement.

Project Details:

  • Application: Overlay
  • Owner: Cushman
  • Location: Lawrenceville, PAEngineer/Specifier: Desmone Associates & Architects
  • General Contractor: Mistick
  • Ready-Mix Supplier: 43rd Street Concrete
  • Concrete Contractor: Hoy Construction

Fiber Reinforcement: FORTA-FERRO® 2.25″ length, 3 lbs per cubic yard

More Information

Previous Article 2014 World of Concrete ACI Commercial/Industrial Finishing Certification Next Article Make the Switch to Macro Synthetic Fiber